- The Feasibility Study started as an EU project with the aim to determine requirements and conditions of the conversion, which was the base for Owners budget and further actions.
- A Hazid (risk analysis) was concluded by assistance and approval of Bureau Veritas.
- The main engine was converted to run on LNG/MDO
- Two LNG tanks, each with a capacity of 250 m3, was fitted on weather deck forward.
- A new LNG system including GVU unit installed in the engine room.
- Some existing equipment in the engine room were re-arranged.
- New Bunker stations and Vapour return stations were located on the weather deck in the vicinity of the existing manifold.
- Firefighting system, Hazardous zones and Stability have also been considered and determined.
The conversion after all preparations was concluded within a six weeks period.
Fallstudier
Upptäck liknande projekt
Upptäck hur FKAB Marine Design framgångsrikt har levererat innovativa och branschledande projekt över hela världen
Innovation, engagemang, förtroende och pålitlighet
Samarbeta med FKAB Marine Design för att driva nästa generations hållbara sjöfart.