- The Feasibility Study started as an EU project with the aim to determine requirements and conditions of the conversion, which was the base for Owners budget and further actions.
- A Hazid (risk analysis) was concluded by assistance and approval of Bureau Veritas.
- The main engine was converted to run on LNG/MDO
- Two LNG tanks, each with a capacity of 250 m3, was fitted on weather deck forward.
- A new LNG system including GVU unit installed in the engine room.
- Some existing equipment in the engine room were re-arranged.
- New Bunker stations and Vapour return stations were located on the weather deck in the vicinity of the existing manifold.
- Firefighting system, Hazardous zones and Stability have also been considered and determined.
The conversion after all preparations was concluded within a six weeks period.
CASE STUDIES
Explore similar projects
Discover how FKAB Marine Design has delivered innovative and successful projects across the globe.
Innovation, passion, and reliability
Partner with FKAB Marine Design to shape the future of sustainable shipping.